Installing steady rest

The team is usually built in a robust way and provided with reinforcement ribs in order to avoid vibrations during machining.
To replace the arms for working in diameter work, it is necessary that the team is equipped with slots for the move.
MG_Supporti
Centraggio_MG Centering

Mounted between the chuck and ground control point
of a pin with a diameter close to that of the workpiece or preferably more. Install the Steady rest on its support,
leaving the screws loose.
Then control the cylinder to close the rolls on the Steady rest
plug and lightly tighten the screws on the bezel which is then automatically centered.
With two comparators in contact with the plug, placed at 90 °
to each other, centering is checked several times to correct
any minor errors by positioning the screws in place
on the team. Then lock the screws securing the Steady rest.